Machinery Breakdown at Electrical Power Plant

320 kVA generator breakdown in combined cycle electrical power plant.
Damages assessed at 9 Million EUR (combined MD and BI).

IES performed a BI assessment based on the Loss of Profit resulting from energy sale to the national grid, using a model which took into account power output profiles and variable energy market prices.